Monday, April 07, 2008

Electrical, Plumbing, A/C

Now that the house in pretty well dried in, it is time for the electricians to run all the cables the the lights, outlets, TV, phone and misc. cables. The lines will not be terminated, they will only be the wires leading from the breaker boxes to the switches and outlets. Once the sheetrock is complete the electricians will finish out the switches and outlets.

The will also be installing all the lines for the showers, toilets, sinks, washer and outside spouts. All lines will be terminated at the end until sheet rock is complete.

The A/C installers will run all the A/C air ducts and copper lines to outside A/C units.